Sunday, December 21, 2008

Vapour Wall


The wall between the garage and the Office will be spray foamed, not to insulate but to stop any Vapours from the garage getting into the house.... I am "fire rated" drywalling from the floor to the Roof basicaly cutting the buiding in two ...

Switch Panel

What happens when you have 12 switches controlling the garage....
you get what looks a mess but takes hours to wire.......
Looks nice but feels way to cold to do any outside work now...

The floor and wall are ready for first fix..

Slow progress

Well the weather final gave in and we have -15 to -25 most days....
I'm tried to get the ceiling done inside as the Propane heater just vents
though the roof, but I need to get the First Fix in and pull all my cables Cat5e for the Computer, RG6 for the Satellite etc...
Plus all the lights, ceiling fans, Eve Lights (And Xmas Sockets for next year)
CCTV cables, Wall Lights for the Doors PIR's etc... all when my Fingers only last 30 Min's before they need warming up again...