Monday, October 20, 2008

Time to prep the floor

Well with the Vapour barrier down then the Insulworks Panelsm the Pipes laidout as per the Drawings, Just have to finish putting down the Rebar in a 1ft spacing grid then tie them all together.... alot of work, but then again what isn't...